Published: 2017-03-28
The 93-tn total weight crane was shipped to the British port from Germany via the Van der Vlist Terminal at Moerdijk.
Once the crane was completely assembled, the finished unit was transported by barge to its final destination. It was placed directly onto rails, and is ready for port operations.