Published: 2018-05-15
The Nuuk-based Royal Arctic Line has entrusted the Bilbao-located shipyard with the construction of two container ships.
The vessels are set for delivery by 2020. The two will replace Pajuttat and the chartered Vestlandia in serving northwest Greenland.
The concept design of the newbuildings will be provided by the Norwegian Havyard.